A new two-story, eight-gate complex built in segments using innovative OCR technique. Part of a multibillion-dollar modernization program at LAX.

Client

Los Angeles World Airports

Duration

Anticipated completion 2025

Architect

Project Size

150,000 SF

Delivery Method

CMAR

Project Attributes

  • Sustainable Project
  • Repeat Client
  • Under Construction

Want to talk about a project?

Andy Herrera

Director of Project Development (CA)

Project Stories

Engineering a Safe Crossing Over the Argo Ditch

Project challenge: navigating the Argo ditch, a flood channel running parallel to the north runway and regulated by four government agencies. The approved solution features a flood-resistant dirt bridge with two 60’ drainpipes, designed to facilitate the safe crossing of segments en route to the airfield. Upon completion, the area will be fully restored to its original condition.

Self-Propelled Modular Transports (SPMTs)

Each segment will be constructed ‘landside’ in the Offsite Construction and Relocation (OCR) Yard, then transported ‘airside’ using Self-Propelled Modular Transports (SPMTs).

150k
Square feet
75k SF
Per level
8
Gates
750k
Square feet concourse